top of page

PROJECT 2

Sur Power Plant, consisting of 5 Siemens Turbines with both primary gas fuel feeds and secondary diesel fuel supply.

Sub-contracted to Wood Group we delivered the following contracts:

Oil Flushing for the turbines,

Chemical cleaning of the diesel fuel lines,

Lube oil flushing of the seal oil system,

Hydrotesting of the 24 inch gas supply line, pigging & dewatering, swabbing and brushing of the line,

Water flushing of the Gas Supply Station & Retrojetting, followed by drying operations,

Oxygen purging of the 24 inch supply line and preservation with nitrogen.

All achieved within project constraints, 0 incidents. 