Sur Power Plant, consisting of 5 Siemens Turbines with both primary gas fuel feeds and secondary diesel fuel supply.
Sub-contracted to Wood Group we delivered the following contracts:
Oil Flushing for the turbines,
Chemical cleaning of the diesel fuel lines,
Lube oil flushing of the seal oil system,
Hydrotesting of the 24 inch gas supply line, pigging & dewatering, swabbing and brushing of the line,
Water flushing of the Gas Supply Station & Retrojetting, followed by drying operations,
Oxygen purging of the 24 inch supply line and preservation with nitrogen.
All achieved within project constraints, 0 incidents.